I currently use a modified version of dcoats 5 frame nuc plans for my nucs. Mostly I use 3/4 inch material instead of 1/2 inch. Also I get a lot of free OSB, some plywood and a little sub flooring. Being It is free I use it. I don't care if the OSB box is only going to last three years because it only cost glue, staples and paint.
At any rate I was wondering if anyone has use the basic build technique to build eight or ten frame deeps?
I am seriously considering making four just as an experiment this season.
At any rate I was wondering if anyone has use the basic build technique to build eight or ten frame deeps?
I am seriously considering making four just as an experiment this season.