    Question

    hey guys any links or tips on embeding wire in to small cell foundation I need some basic infomation. thanks

  2. #2
    Join Date
    Aug 2002
    Location
    Nehawka, Nebraska USA
    Posts
    46,084

    Post

    I don't bother. With a medium I don't use any wire at all. With a deep, I just put a wire on one side diagnally and another on the other side diagnally making an "X" and throw in some split pins or bobby pins. The wires aren't embedded. I have occasionaly embedded them with a soldering gun when I didn't use the frame soon enough and the wax warped a bit. http://www.beesource.com/eob/althive/bush/bush5.htm


    Here's some info on embedding. http://www.beesource.com/eob/wire_embedder/

  3. #3
    Join Date
    Jun 2003
    Location
    Lakeland FL
    Posts
    844

    Post

    can i use a battery charger and take the two clips and clip them on to the fram wire?

  4. #4
    Join Date
    Dec 2000
    Location
    crown point, NY, USA
    Posts
    971

    Post

    Yes. I use a car battery charger. Don't clip them on though or you'll cook the wires right through the foundation. Just touch the clips to the wires real quick. You can do one wire at a time or all at once. You'll have to decide which way you prefer.

  5. #5
    Join Date
    Jan 2004
    Location
    anaheim california USA
    Posts
    23

    Lightbulb

    Swarm trapper, get yourself a regular doorbell transformer. Wire nut an extension cord onto it. Run two low voltage wires from the screws. Attach one wire up high & one at the lower end of the frame wires & your in business. Works great......

  6. #6
    Join Date
    Jun 2003
    Location
    Lakeland FL
    Posts
    844

    Big Grin

    clayton if if want to do sll of the wires where do i touch the wires and after the you stop touching the wire do you push the frame down onto the embedding board? thanks guys

  7. #7
    Join Date
    Dec 2000
    Location
    crown point, NY, USA
    Posts
    971

    Post

    You touch the wire (top one) near were it anchors to the frame inside of the end bar. Then you touch the bottom wire opposite side of whatever side you touch the top wire. I hope that makes sense. I then quickly run my hand onto the foundation to make sure the foundation embedds properly.

    I personally prefer to due one wire at a time. But sometimes I do the above.

  8. #8
    Join Date
    Jun 2003
    Location
    Lakeland FL
    Posts
    844

    Post

    how do you do one at a time?

  9. #9
    Join Date
    Dec 2000
    Location
    crown point, NY, USA
    Posts
    971

    Post

    I just touch on the wire with the clips on each side real quick (one wire at a time), then I take my pinkies and quickly swipe across the foundation to get the wire embedded to proper depth.

  10. #10
    Join Date
    Jun 2002
    Location
    Drums, PA, USA
    Posts
    331

    Post

    I use a vcr power supply, that I found a 17vac output from. Like everybody has said, don't let it hooked up too long, or it will go right thru. I also kinda form the hot wax around the wire to. Practice makes close to perfect!

  11. #11
    Join Date
    Aug 2002
    Location
    Evansville, IN, USA
    Posts
    2,837

    Question

    Last year, while embedding wire, somehow I managed to burn-up TWO door bell transformers. At first the wire would heat up just right, but after a few frames, the transformer(s) stop working. Last one only embedded about 4 or 5 wires.

    What did I do wrong?

    ------------------
    Dave W . . .

    A NewBEE with 1 hive.
    First package installed
    April, 2003.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Ads